Skip to content
USA-based | Salt Lake City, Utah | EST 2016
USA-based | Salt Lake City, Utah | EST 2016

Country

Verified Reviews
About Us
Frequent Questions
Contact Us

Yeger Hunter Russian CAMO Unisex Athletic Long Shorts

Original price $39.00 - Original price $39.00
Original price
$39.00
$39.00 - $39.00
Current price $39.00
Choose a Size

Long Sports Shorts

Sports outfits can be a hassle, but with these long shorts, there's no need for that. Just throw on a pair and go running, swimming, weight-lifting, or participating in any other activity that pops into your mind. These shorts won't let you down!

  • 91% recycled polyester, 9% spandex
  • Fabric weight: 5.13 oz/yd² (174 g/m²)
  • Four-way stretch moisture-wicking microfiber fabric
  • Breathable and fast-drying material
  • UPF50+ protection
  • 6.5″ (16.5 cm) inseam
  • Elastic waistband with a flat white drawstring
  • Mesh side pockets
  • No inner lining
  • Blank product components sourced from China
Description

Long Sports Shorts

Sports outfits can be a hassle, but with these long shorts, there's no need for that. Just throw on a pair and go running, swimming, weight-lifting, or participating in any other activity that pops into your mind. These shorts won't let you down!

  • 91% recycled polyester, 9% spandex
  • Fabric weight: 5.13 oz/yd² (174 g/m²)
  • Four-way stretch moisture-wicking microfiber fabric
  • Breathable and fast-drying material
  • UPF50+ protection
  • 6.5″ (16.5 cm) inseam
  • Elastic waistband with a flat white drawstring
  • Mesh side pockets
  • No inner lining
  • Blank product components sourced from China
Production Time

Most CAMO HQ products are made to order and normally require approximately 3–7 business days for production before shipping. Due to a temporary surge in demand and limited production capacity, all-over print products fulfilled from our Latvia facility may currently require 7–9 business days for production. This delay affects only qualifying AOP items produced in Latvia and does not include shipping transit time. Production times are expected to return to normal by early August, depending on order volume.